Friday, April 4
ROADSHOW Week of April 6, 2025
Here, you'll find all of the NEW projects, maintenance, and other work taking place in our 11 county district:
Boone, Bracken, Campbell, Carroll, Gallatin, Grant, Harrison, Kenton, Owen, Pendleton, and Robertson Counties
Click the button below to take a look at all of the projects happening right now.
New items or changes in project status are italicized.
*Inclement weather or other unforeseen circumstances may occur, so the information below is strictly of an advisory nature and is subject to change with no notice.
Learn more about the Brent Spence Bridge Corridor project here. Project updates are also being provided via Facebook and X (formally Twitter).
Project updates/information for KY 536 widening and safety improvement projects can be found here.
Follow KYTC District 6 ON Facebook or Twitter for updates on District 6 projects. To subscribe to District 6 press releases, please click HERE.
HIGH WATER REPORT
Due to the heavy rainfall we've experienced — and more expected through early Sunday morning, April 6 — we've created a separate report to track weather-related road closures.
Please note that high water may still be present on roads not listed in the report. Drivers are strongly encouraged to check GoKY for real-time traffic conditions before traveling. Never drive through a flooded roadway. We've received multiple reports of motorists bypassing barricades and entering flooded areas.
Remember: Turn around. Don’t drown.
For a full list of closures related to this widespread rain event, visit our High Water Report here.
VARIOUS COUNTIES (BOONE, CAMPBELL, KENTON, GRANT AND GALLATIN):
Street sweeping will begin on Sunday, April 6, between 6 p.m. and 6 a.m. Weather permitting, sweepers will be out Monday night through Friday morning until the work is complete on Friday, April 18. This work is performed once a month to clean and maintain highway shoulders along barrier walls, bridges and bicycle lanes.
INTERSTATE LOCATIONS:
- I-75 (143 – 192 mile marker; both directions): from the Ohio River to Grant/Scott county line. Sweeper will move through Boone, Kenton and Grant counties.
- I-471 (entire interstate, both directions): from the Ohio River to I-275 Interchange
- I-275 (entire interstate, both directions): from Ohio to Indiana. Sweeper will move through Boone, Kenton and Campbell counties
- I-71 (77.7 – 54.9 mile point): from the I-75 split in Boone County to Exit 55 (to KY 1039) to Vevay, Indiana, in Gallatin County
- KY 1039 (0.64 – 7 .11 mile point) in Gallatin County
BIKE LANE LOCATIONS:
Kenton County:
- KY 17 from I-275 Interchange to KY 16 in Independence
- Pride Parkway/Taylor Mill Road (KY 16) from I-275 Interchange to Klette Road (KY 2047)
- Turkeyfoot Road (KY 1303) from I-275 interchange to Richardson Road (KY 842) in Independence
Boone County:
- Houston Road (KY 842) from Burlington Pike (KY 18) to Commonwealth Ave (KY 236) in Kenton County
- U.S. 42 from Pleasant Valley Road/Gunpowder Road (KY 237) to Ryle Highschool in Union.
- North Bend Road (KY 237) from I-275 interchange to Graves Road
The sweeper collects debris, loose gravel, nails, etc. all things that could impact motorists if they need to utilize the highway shoulder for an emergency.
Contractors will occasionally utilize a single lane closure for the sweeper to complete passes along narrow shoulders on I-71/75 and other needed areas. Slow down and be aware of slow-moving equipment and potential lane closures during this mobile operation.
KENTON & CAMPBELL COUNTIES:
BOONE COUNTY:
-
Verona Mudlick Road (KY 14) – 2.18 mile point – A bridge maintenance project will begin on Monday, April 14, on the Verona Mudlick Road overpass over I-71. This is located at the I-71 Verona exit. Traffic will be reduced to a single lane with temporary signals in place throughout the project area. Motorists should watch for lane closures, equipment and trucks entering/leaving the project area.
Weather permitting, this project is expected to be completed Monday, April 21.
The schedule for this work has been adjusted due to the inclement weather.
CAMPBELL COUNTY:
-
Three Mile Road (KY 2238) – 1.4 – 1.5 mile point – A maintenance project on a portion of Three Mile Road to repair ashalt along the edge of the roadway is now complete. Additional repairs are expected later this year.
KENTON COUNTY:
-
Dixie Highway/Pike Street (U.S. 25) – 12.0 – 12.29 mile point – A maintenance project on U.S. 25 from west of Grays Peak to south of W. 12th Street in Covington is now complete and the lane closure has been removed. The work included stabilizing the hillside around a bend on Dixie Highway/Pike Street.
-
Howard Litzler Drive (KY 3070) – 0.0 – 0.87 mile point – A resurfacing project on Howard Litzler Drive between KY 17 and KY 16 is in progress.
Base failure repairs are now complete. Milling/paving operations have not yet been scheduled. KYTC will provide an update on the Roadshow and social media once milling/paving operations have been scheduled.
The project is expected to be completed by June 30, 2025.
-
Kyles Lane (KY 3187) – 0.0 – 0.95 mile point – A resurfacing project on Kyles Lane between KY 17 and Highland Pike is in progress.
Base failure repairs are now complete. Milling/paving operations have not yet been scheduled. KYTC will provide an update on the Roadshow and social media once milling/paving operations have been scheduled.
The project is expected to be completed by June 30, 2025.
-
Kyles Lane (KY 3187) – 0.4 – 0.72 mile points – A slide repair project is in progress on Old Kyles Lane. Crews have placed barricades between Farrell Drive and mile point 0.4 to block thru traffic. Only local traffic will be maintained:
- Homes at/north of 800 Kyles Lane will use Highland Pike for local access to Kyles Lane.
- Homes at/south of 845 Kyles Lane will use Madison Pike for local access to Kyles Lane.
No thru traffic will be permitted on this portion of Kyles Lane. Motorists can detour using Madison Pike (KY 17) to Highland Pike (KY 1072).
Weather permitting, this maintenance project is expected to be completed Friday, April 18. The completion date for this project has been extended due to inclement weather.
Didn't see the project you're looking for?
This report highlights NEW projects and UPDATES for on-going projects. Our website roadshow stores ALL the information for all the projects that are currently taking place around the district. Please visit the link below for the most detailed project descriptions.
Contact the D6 PIO Office for More Information: