Pothole repairs scheduled for Interstate 75 in Madison County
Operations will be North and Southbound
LEXINGTON, Ky. (Jan. 31, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of scheduled pothole repair operations. Rolling Roadblocks (a mobile operation) will be utilized for the work. Law enforcement will be assisting with traffic control and high intensity lighting.
Monday, Feb. 3 – 12 a.m. (midnight) until 6 a.m.
Tuesday, Feb. 4 – 12 a.m. (midnight) until 6 a.m.
Interstate 75 – North & Southbound
- repairs will begin at Duncannon Lane (milepoint 84) and continue to the Clays Ferry Bridge at the Madison-Fayette County line (milepoint 98)
- work will begin on the Northbound side with the first Rolling Roadblock at milepoint 83
The traveling public should expect delays during the hours of scheduled repair operations.
Motorists in Kentucky may report potholes for state routes through the following:
- Toll free: 1-877-FOR-KYTC (1-877-367-5982)
"Contact Us" menu at the top of the KYTC website found here:http://transportation.ky.gov or via this link: https://bpm.kytc.ky.gov/appbuilder/forms?code=810A005056A2147711773A3B03F6EFEF&Process=PA-DV-ReportAPothole
All work/closures are scheduled on a tentative basis and subject to change depending on weather, emergencies and other factors beyond the control of the Department of Highways.
District 7 includes Anderson, Bourbon, Boyle, Clark, Fayette, Garrard, Jessamine, Madison, Mercer, Montgomery, Scott and Woodford Counties.
Keep up with the Kentucky Transportation Cabinet:
Navigate traffic with GoKY or via Waze on your smartphone!
###
|