Work Zones for Panel Sign Work along I-24 in Kentucky on Today & Tuesday

KY State seal

 

Kentucky Transportation Cabinet • District 1

FOR IMMEDIATE RELEASE

Media Contact: Keith Todd
270-898-2431 (office)
270-210-8009 (cell)
Keith.Todd@ky.gov

Eastbound Work Zones for Panel Sign Work

along Interstate 24 in Kentucky Today & Tuesday

Sign work to include lane restrictions

PADUCAH, Ky. (March 13, 2023)  A contractor for the Kentucky Transportation Cabinet (KYTC) plans to replace several of the large Interstate panel signs along the eastbound  Interstate 24 today and Tuesday, March 13 & 14, 2023.

There will be intermittent work zones at the following locations as the crew replaces damaged panel signs:

Monday, March 13
I-24 Eastbound McCracken County - all traffic moved to left-hand or passing lane at 8.61mm and 9.71mm from approximately 9 a.m. to 3 p.m., CDT

Tuesday, March 14
I-24 Eastbound McCracken County - traffic initially moved to left-hand or passing lane at 2.7mm at Exit 3 for overhead truss signage work starting at 9 a.m., CDT

Motorists should be alert for slowing and merging traffic at these locations.  Some delays are possible during the movement and placement of equipment to facilitate the work.

Appropriate caution is required where equipment, flaggers, and maintenance personnel are along the roadway in close proximity to traffic flow.

To get traffic advisories and alerts for KYTC District 1 counties via email please go to https://public.govdelivery.com/accounts/KYTC/signup/13651. Click on the District 1 counties you regularly drive through, or on any of the specialty corridors you travel.  Check your SPAM filtering to assure Gov Delivery is on your approved list.

Timely traffic advisories for the 12 counties of KYTC Highway District 1 are available by going to www.facebook.com/kytcdistrict1. You do not have to be a Facebook member to access this page.

Navigate traffic at goky.ky.gov, at waze.com, or with the WAZE App.

###