Historic Roebling Suspension Bridge to Undergo Inspection, Beginning Monday, Aug. 1
Will require intermittent closures; one pedestrian walkway to be closed throughout
COVINGTON, Ky. (July 29, 2022) – The historic John A. Roebling Suspension Bridge, which links Covington and Cincinnati, will undergo a scheduled inspection beginning Monday, Aug. 1.
Inspectors will be working Monday through Friday, 8 a.m. to 5:30 p.m. EDT, with completion scheduled Aug. 10, depending on weather.
The bridge will be closed intermittently as equipment has to be moved, and one pedestrian walkway will be closed throughout the inspection period. Six closures, of up to 60 minutes each, could occur between 9 a.m. and 11:30 a.m. and/or 1:30 p.m. to 3 p.m.
Motorists should watch for crews, equipment and signage regarding the closure. The Roebling Bridge is on KY Route 17.
Motorists can get Northern Kentucky road construction updates on District 6 Road Report. Follow KYTC District 6 on our Facebook page at KYTC District 6 or on our Twitter page at KYTC District 6. For Kentucky’s latest traffic and travel information, visit GoKy or navigate traffic by downloading the free Waze app at WAZE
###
|