Asphalt operations scheduled for Interstate 75 Southbound in Fayette County

Kentucky Transportation Cabinet

 

Kentucky Transportation Cabinet • District 7

FOR IMMEDIATE RELEASE

Contact: Natasha F. Lacy
859-246-2355 (office)
859-229-8447 (cell)
NatashaF.Lacy@ky.gov

Asphalt operations scheduled for I 75 SB in

Fayette County

Strip patching between milepoints 102 and 106

LEXINGTON, Ky. (June 12, 2022) – The Kentucky Transportation Cabinet (KYTC) advises motorists of scheduled asphalt work. Strip patching work (a mobile operation) will be in effect for a section of Interstate 75. The milling and paving is necessary to repair damaged asphalt.

Monday, June 13 through Friday evening, June 17/Saturday morning, June 18 7 p.m. each evening until 7 a.m. the following morning

Interstate 75 - Southbound

  • strip patching will be in effect between milepoints 102 and 106
  • a double lane closure will be in place
  • one lane will remain open at all times
  • motorists will be able to pass through the work zone

Motorists should expect delays and utilize alternate routes if possible.

All work/closures are scheduled on a tentative basis subject to change depending on weather conditions, emergencies and other factors beyond the control of the Department of Highways.

District 7 includes:  Anderson, Bourbon, Boyle, Clark, Fayette, Garrard, Jessamine, Madison, Mercer, Montgomery, Scott, and Woodford Counties

Keep up with the Kentucky Transportation Cabinet:

Navigate traffic with GoKY or via Waze on your smartphone!

 

###