Update - New Circle Road/KY 4 in Fayette County
Part of the New Circle Road/KY 4 Widening Project
The entire project is located between milepoints 8.732 and 10.015
LEXINGTON, Ky. (March 6, 2022) – The Kentucky Transportation Cabinet (KYTC) advises motorists that this news release serves as an update. Temporary closures are scheduled to continue for New Circle Road/KY 4. The closures are necessary to relocate sign bases along the barrier wall. This work is included in the widening project.
Monday, March 7 through Friday, March 11 – 7 a.m. Monday until 5 p.m. Friday
Monday, March 14 through Friday, March 18 – 7 a.m. Monday until 5 p.m. Friday
New Circle Road/KY 4 – Inner and Outer Loops
- the left shoulder and left/fast lane between Georgetown Road/US 25 (milepoint 8.731) and Newtown Pike/KY 922 (milepoint 9.324) will be closed
All work/closures are scheduled on a tentative basis, and subject to change depending on weather, emergencies and other factors beyond the control of the Department of Highways.
District 7 includes: Anderson, Bourbon, Boyle, Clark, Fayette, Garrard, Jessamine, Madison, Mercer, Montgomery, Scott and Woodford Counties
Keep up with the Kentucky Transportation Cabinet:
Navigate traffic with GoKY or via Waze on your smartphone!
###
|