Cooper Chapel Road Section III – Road Extension Project Beulah Church Road to Bardstown Road
The Plan/History & General Information:
The project involves the design and construction of Cooper Chapel Road from Beulah Church Road to Bardstown Road. The design includes 2 driving lanes with a raised median, bike lanes, sidewalks, and a shared use path. The project-length is approximately 3 miles. Click the links below to see a map of the proposed roadway alignment, and the proposed typical section.
Design History / General Information:
- The preliminary design is 100% complete.
- Final design for right-of-way plans is 100% complete. Final design for structural plans is in progress.
- Delays to the purchase of right-of-way were experienced with the discovery of Kentucky Glade Cress (identified as a threatened species in 2014) along the proposed alignment of Cooper Chapel Road. A mitigation strategy for the Kentucky Glade Cress was developed and is being implemented.
- Right-of-way acquisition is in progress and is anticipated to be complete in the fall of 2023. Once all properties are clear, utility relocation and construction are anticipated to begin in the fall of 2024.