(Washington, DC)—The District Department of Transportation (DDOT) will temporarily close lanes, ramps and shoulders on the following roadways to perform construction activities along I-395 for the replacement of signage and sign structures. The start of closures will occur during off-peak periods and is contingent on suitable weather, field conditions, and/or adjacent construction activities.
The following lane, ramp and shoulder closures will be in place daily and nightly:
- Single Right Lane Closure on ramp from I-695 Westbound to Center Leg Freeway.
- Single Right Lane Closure I-395/I-695 Northbound/Eastbound between 7th Street SW and the Center Leg Freeway.
- Single Left Lane Closure on ramp from I-395 Northbound to Center Leg Freeway.
- Single Left Lane Closure on Center Leg Freeway Southbound.
- Double Left Lane Closure on I-395 Southbound between Center Leg Freeway and Maine Avenue SW.
- Full closure of ramp from C Street SW to I-695 Eastbound.
- Full closure of ramp from Washington Ave SW to I-695 Eastbound.
- Full closure of ramp from I-395 Northbound to C Street SW.
- Full closure of ramp from 9th Street Expressway to I-395 Northbound/I-695 Eastbound.
For the C Street and Washington Ave ramp closures, vehicles will be detoured using Independence Avenue SW, 9th Street Expressway, and I-395 Northbound as indicated in the map below. If access to Independence Avenue is prohibited, then vehicles will be detoured using 2nd Street SW, I-395 Southbound, and I-395 Northbound. Notable delays should be expected around the project area and motorists are advised to use an alternative route, if possible.