US 60 (Grand Avenue) and Thunderbird/Thompson Ranch roads Study Draft Environmental Assessment Available

ADOT  

Bookmark and Share   ADOT on Facebook  ADOT on Twitter  ADOT on YouTube  

US 60 (Grand Avenue) and Thunderbird/Thompson Ranch roads Study Draft Environmental Assessment Available
Public hearing on Thursday, May 15 in El Mirage

 

On May 1, the Arizona Department of Transportation and the Federal Highway Administration have released the Draft Environmental Assessment (EA) for the proposed intersection improvements at US 60 (Grand Avenue) and Thunderbird/Thompson Ranch roads. This release launched a 30-day public comment period that ends on May 30, 2014. 

 

The draft environmental document can be found on the project website and at the locations below during regular business hours:

  • El Mirage City Hall-12145 NW Grand Ave. #4, El Mirage, AZ 85335
  • El Mirage Branch Library-14011 N. First Ave., El Mirage, AZ 85335
  • ADOT Environmental Planning Group-1611 W. Jackson St., Phoenix, AZ 85007 (Call 602.712.7767 for an appointment.)

The Draft EA covers potential impacts from proposed intersection improvements, purpose and need for improvements, alternatives studied and public outreach efforts since the study was launched. 

 

To provide input during the 30-day public comment period, attend the public hearing on May 15, 5 p.m. to 8 p.m., at the El Mirage Senior Center, 14010 N. El Mirage Rd., El Mirage, AZ 85335

 

Unable to attend the hearing, you may provide comments by:

Email: projects@azdot.gov

Online: azdot.gov/Tbird

Phone: 855.712.8530

Mail: ADOT US 60 (Grand Avenue) and Thunderbird/Thompson Ranch roads Study Team, 1655 W. Jackson St., MD 126F, Phoenix, AZ 85007

 

Comments must be submitted by May 30, 2014. All comments received during the 30-day public comment period will be documented and responded to in the Final EA.