Motorists on US 60 between Miami and Superior will encounter lane restrictions and delays Monday, Nov. 8, near the Pinto Creek Bridge for guardrail repairs.
Alternating lane closures with flaggers are scheduled from 8 a.m. to 4 p.m.
This work is in addition to ongoing guardrail repairs between mileposts 239 and 243 near Miami, due to damage from summer floods. Work will continue Mondays through Thursdays between 7 a.m. and 3:30 p.m.
While delays will generally be limited to 15 minutes, longer delays are possible during peak travel times.
Motorists should proceed with caution, slow down, watch for equipment, and follow the directions of flaggers and law enforcement.
More information about the project is available at azdot.gov/PintoCreekBridge.
|