ODOT Region 4 Weekly Construction Report

Having trouble viewing this email? View it as a Web page.

Central Oregon Road Construction UPDATE: Week of April 11, 2016

 For further information contact:

Peter Murphy

541-388-6224

The Oregon Department of Transportation (ODOT) is continuing to invest in Oregon’s future with roadway improvement projects throughout Oregon’s central region (ODOT Region 4). ODOT is committed to providing a safe, efficient transportation system. The following projects reflect ODOT’s commitment to make improvements as traffic numbers rise and to make the roadways safer and more efficient for drivers. All work is dependent on weather conditions. Red denotes new or updated information.

DESCHUTES COUNTY

US97 @ Wickiup Jct. (La Pine)

Project Consists of Bridge, Earthwork, and Drainage along US97.

Contractor placing embankment on the East and West side of the BNSF tracks on mainline. Contractor to continue forming overpass structure and installing reinforcement bar. Overpass support wall construction will be ongoing and the contractor will start placing the wall backfill accordingly.

 

http://www.oregon.gov/ODOT/HWY/REGION4/pages/us97_wickiup_jct/us97_wickiup_jct.aspx

Sunriver to Lava Butte Multi-Use Path Project

Construction of a Multi-Use Paved Path from Cascade Road in Sunriver to Benham East Day Use Area and Lava Lands Visitor Center.

Contractor has finished all kiosk work.

 

KLAMATH COUNTY

OR 140: Ritter Rd. – Deer Run Rd. (Bly Mtn.)

This project will reconstruct 9.2 miles of OR 140 in the Bly Mountain area (from Ritter Road to Deer Run Road). The intersection of OR 140 and the Bly Mountain Cutoff Road will be realigned.

 

Pipe work, aggregate base placement, pipe work, excavation, embankment

One lane traffic controlled by Flaggers and Pilot Cars 24/7

Expect delays up to 20 minutes.

http://www.blymtn.com

 

LAKE COUNTY

US395: Alkali Lake – Lake Abert

Cold plane paving removal, concrete stabilization work, paving.

One Lane Traffic controlled by Flaggers and Pilot cars 24 hours / 7 days a week..

Expect delays up to 20 minutes

http://www.oregon.gov/ODOT/HWY/REGION4/Pages/US395-AlkaliLake-LakeAbert.aspx

 

WASCO COUNTY

I-84: The Dalles – Fifteenmile Creek MP 83.5 – 88.5

Wildish Standard Paving Company will be replacing the concrete pavement located on Interstate 84 within the city limits of The Dalles. They will also be constructing a new bridge on I-84 over Threemile Creek. The work will take place in stages in order to minimize delays and ensure that both freeway lanes are open in each direction during peak traffic volumes.

For the week of April 18th, 2016. The contractor will be concrete paving. Also, the contractor will continue bridge work at the 3-Mile Creek bridge structure.

I-84 is reduced to a single lane in both the east and westbound direction. Speeds have been reduced to 50mph through the construction zone.

http://www.oregon.gov/ODOT/HWY/REGION4/Pages/I84-TheDalles-FifteenmileCr.aspx

I-84: Mosier to The Dalles

Project consists of paving, and the installation of new median barrier.

For the week of April 18th, 2016. The Contractor will be removing the old substandard barrier and the median asphalt. After the contractor has removed all materials they will install new asphalt and barrier in the median throughout the project.Single lane closures will be from MP 71 - MP 77

I-84 will be reduced to a single lane in both the East and West bound direction.

Project work hours: Sunday 7:00pm to Friday 11:00am -- Daytime

 

US 97: Moro to Madras

KERR Contractors will be replacing 29 miles of pavement on U.S. 97 between Grass Valley (MP 27.1) and Shaniko (MP 56.7). The project also includes the construction of passing lanes between MP 43.8 and MP 45.4, installation of new highway signs between Moro and Madras, and adding ADA compliant sidewalk ramps in Grass Valley.

For the week of April 18th, 2016. The Contractor will continue Asphalt paving and Grinding Operations at approx. MP37- MP47.

 

http://www.oregon.gov/ODOT/HWY/REGION4/Pages/US97-Moro-Madras.aspx

####