State
officials have notified opponents of widening Chenoweth Lane that the three-lane widening is no longer under consideration.
"The decision was made to remove the 3-lane widening of
Chenoweth Lane from consideration for this project because 1) the capacity
analysis and future traffic growth do not warrant three lanes throughout, 2)
public opposition to the widening, and 3) the benefits will not be realized by
the cost of a three lane widening project (Cost/Benefit ratio). Other
alternatives are still being considered and will be presented at the next
public meeting at the end of February."
Alternatives that are still being discussed are changes in drainage and improvements to the pedestrian and
bicycle facilities.
|
Public Information Meeting
Monday, February 29, 5:00 – 7:00 p.m.
Broadway Baptist Church
4000 Brownsboro Road, Louisville, KY 40207 An informal meeting format will be used (Stop by anytime between 5:00 p.m. and 7:00 p.m.)
This meeting is to get input from the public on potential improvements to KY 1932 (Chenoweth Lane) between
US 60 (Shelbyville Road) and US 42 (Brownsboro Road). |